top
News Category

Tempered Appliance Glass Process

Tempering is the step that turns a cut and processed appliance panel into toughened glass before it is packed for an OEM or ODM customer. At ZITA Glass this sits in the same production path as cutting, edge and corner grinding, drilling, CNC machining, printing, coating, inspection and protective packaging. The homepage lists six glass tempering lines among the factory’s process equipment. This page is a short process overview. For a fuller buyer briefing, see What OEM Buyers Should Know About Tempered Appliance Glass.

What the process covers

On this site, a tempered appliance-glass project starts with a drawing or with panel dimensions, thickness, application and quantity. The factory reviews holes, cutouts, edge finish and decorative requirements against that briefing, then plans the path so those features are completed before the glass enters a tempering furnace. The homepage FAQ states this constraint directly: holes and cutouts must be processed before glass tempering. Once a panel is tempered, those openings cannot be added as a later shop-floor change.

That sequence applies across the live catalog of refrigerator doors, oven doors, gas hob and cooktop surfaces, and range hoods, as well as related parts such as refrigerator glass shelves and chest-freezer sliding lids. Name the part and the appliance at the start so the review begins from the right family.

How published projects use tempered glass

Public case studies on this site use fully tempered glass for documented OEM parts. The Whirlpool refrigerator door case describes 3.2 mm fully tempered door glass. The Electrolux case describes 3.2 mm fully tempered refrigerator door panels and a separate clear tempered washing-machine lid. The Panasonic NT-H901 toaster oven case describes 4 mm fully tempered oven door glass; heat resistance up to 300°C is listed there as a project quality requirement, not as a general rating for all appliance glass. Those thicknesses belong to the projects that published them. They are not defaults for a new model.

What to confirm with the factory

Include the drawing or overall size, nominal thickness, edge finish, and the position of any holes, cutouts or windows. If the panel will also be printed, coated or given an anti-glare or other surface finish, say so in the same briefing so those steps can be planned with the tempering sequence. Related process pages cover silk-screen printing, UV digital printing, AG anti-glare glass and hydrophobic finishes. Hole and cutout types are discussed in the drilling and cutout article.

Production feasibility and tolerances are confirmed before sampling. Minimum order quantity and lead time are not published as fixed figures; the homepage FAQ states that they depend on the specification, processing, printed design and order volume. For the drawing-to-packaging path, see OEM Project Support. Send the drawing and quantity through the Contact page or the product inquiry form.